| Method of Application |
| 1.) | Read entire label before using. |
| 2.) | Ensure that the grout joints are clean and dry before application. |
| 3.) | Shake the pen with cap on before use. |
| 4.) | Depress the nib several times to activate paint flow. |
| 5.) | Apply directly yo joint. If necessary repeat after 1 hour. |
| 6.) | Remove excess with a damp cloth. |
Coverage |
| Approximately 60m² (200 ft.) per tube based on a narrow grout joint. |